Car Tourismo Banner
Home » Tag Archives: Tipperary Energy Agency

Tag Archives: Tipperary Energy Agency

Retrofit gives Lahinch Leisure Centre energy to look to future

LAHINCH Leisure Centre was spending up to €120,000 just to heat its swimming pool a few years ago. Now, as part of a major €6 million retrofit the complex has been transformed into a Near Zero Energy Building (NZEB). In an interview with the Clare Champion, John Hayes, Senior Building Services Engineer with contractors Tipperary Energy Agency recalled the centre was spending €120,000 on oil just to heat the pool and half the building. Mr Hayes estimated the centre will now spend €85,000 annually to heat the entire building. “Now the heating system is heating all the building at a fraction of the cost. Lahinch Leisure Centre is a great example of what can be achieved in public buildings. “A lot of swimming pools are still putting in gas boilers. We had an option to keep the old oil boiler as a back-up but we decided to go fully green. “Lahinch Leisure Centre is a flagship project to show this …

Read More »

Lahinch Leisure Centre a shining example of smart energy

MINISTER Heather Humphreys was in Lahinch this morning to officially open the Lahinch Leisure Centre, a shining example of smart energy usage and generation. As part of its €6m renovation and expansion, the Centre has enjoyed an extensive energy retrofit under the auspices of the Tipperary Energy Agency. Now, alongside its top of the range insulation and ground source heat pump that heats the pools, solar panels on the roof generate much of the centre’s energy requirements. Alongside that, the ductwork throughout the centre is made from recycled materials. Indeed, no fewer than 3,717 plastic bottle have been repurposed to this effect The centre’s green journey began in September 2018 when engineers from the agency completed an energy audit to understand how much energy the building was using and pinpoint necessary works to upgrade the facility. Following the audit Tipperary Energy Agency were appointed Mechanical and Electrical Design Engineers and Energy Consultants. Prior to the retrofit, the leisure centre (part …

Read More »